Projects List
Home
Projects List
Inquiry
Contact Us
Toggle navigation
Home
Company
Message from the CEO
About Us
Mission & Vision
Ownership
Meet EPS Executives
Useful Links
ISO Certification
Services
Distribution Networks
Substations
Transmission Lines and Cables
Civil works
Power Stations Projects
Overseas Operations
Networks Studies
Projects Control
Information Technology
Projects
Distribution Networks
Substations
Transmission Lines and Cables
Networks Studies
Civil works
Information Technology
Overseas Operations
Power Stations Projects
Projects Control
Training
Media Center
Presentations
Exhibitions
Press Releases
Training
Careers
Our Culture
Technical Training Services
Benefits And Rewards
Register with EPS
Vacancies
From our Projects
Civil works
Engineering consultancy services for the design and studies of the administrative building and its annexes for Cairo Electricity Production Co. – Phase 1: Design and Studies
Owner /
Cairo Electricity Production Company
Date /
Start Date 2/25/2024 & A waiting for Site handing over
Supervision of overhead electrical line implementation between October 500 / Main October, 220 kV, ~32 km – New October City
Owner /
New October City Authority
Date /
3/17/2024
Supervision of opening double-circuit overhead line (Wadi El Natrun / Abu El Matamir), 500 kV (In/Out), ~2×45 km to Borg El Arab Substation
Owner /
Egyptian Electricity Transmission Co., Alexandria & West Delta
Date /
3/17/2024
Lot 1: 66 kV linkage lines between ND9 and ND1 substations (~50 km) - Lot 2: 66 kV linkage lines between ND9 and ND7 substations (~34 km)
Owner /
Al-Kharafi Company
Date /
8/7/2024
Study on the load capacity of 220 kV towers in the electrical network to use them as single
Owner /
Egyptian Electricity Transmission Company – Cairo Region
Date /
11/12/2024
1
2
3
4
5
6
7
8