Networks Studies
Study the first nuclear power station interconnection with the unified network.
Owner : Worley parsons Eng. Ltd.
Completion Date : February 2010
Description
· Assess the different proposed alternatives for the 500kV transmission lines for the nuclear power plant interconnection with the Egyptian network in the year 2018.
· Perform load flow and short circuit studies for the Egyptian grid including the 1200 MW nuclear plant with 4 units for the different proposed alternatives and choose the best alternative.
· Perform the transient stability study for the planed Egyptian grid of the year 2018 including the 1200 MW nuclear plant with the best chosen alternative.