Networks Studies
Sharm El-Sheikh and South Sinai High voltage network planning up to the year 2022.
Owner : EEHC
Completion Date : 2009
Description
· Set planning criteria.
· Assessment of the proposed plans up to the year 2007.
· Detailed System planning up to the year 2022.
· Systems analysis for the planned networks up to the year 2022 (load flow, short circuit
and contingency analysis).