Feasibility Study for Wau Hydropower Plant (10.4MW, 64Gwh/year) in South Sudan
Owner : Ministry of Water, Energy and Mines- South Sudan
Completion Date : 2014
Description
Preparation of Feasibility Study including:
Identification of Plant size, capacity, turbines types and configuration.
Design of Hydro power Turbines Connection of the hydro power plant to the network.
Economics and Cost estimate Environmental Impact of the project Implementation Plan.